Safe work method statements

The work method.
The crew. The current version.

Online SWMS software for construction teams. Prepare a site-specific work method or record one received from a contractor, then keep assessment, consultation, review and crew acknowledgements with its version.

Fictional Harbour House SWMS: approved carpentry with one recorded acknowledgement, and electrical isolation awaiting approval.
Work methods and their review stateAn approved version and a version awaiting approval are shown separately. Acknowledgements remain tied to their version.
Sample site · SafeSite 0.9.21View full size View full size

The working sequence

Keep the method connected to the work.

Managers prepare and review. Assigned people inspect and acknowledge their version.

  1. Prepare or obtain

    Build against the in-effect site plan, or record and assess received SWMS.

    Draft or received
  2. Consult and review

    Record consultation, assess controls and retain the review decision.

    Review
  3. Assign and acknowledge

    Give the relevant people the approved version for acknowledgement.

    Approved version
  4. Monitor and revise

    Record checks and concerns. Retain changes and stop-work outcomes.

    Ongoing follow-up
Record context

Acknowledgement and operational decisions

Consultation entries are manager-recorded assertions. Acknowledgement is not statutory approval, proof of understanding, proof controls were implemented or authority to start work.

Permits and current site conditions still require operational decisions by the responsible people.

In day-to-day use

Questions about SWMS.

How the steps and records fit together for your team.

Which site plan does a SWMS relate to?

A SWMS is prepared against the site's WHS management plan currently in effect. SafeSite keeps the consultation entries, controls, review decision and assignments with the relevant SWMS version, connecting the work method to its site context.

See how a WHS plan is put in effect

What happens to the SWMS record when the work changes?

SafeSite keeps later change records and worker acknowledgements tied to the SWMS version involved. In a walkthrough, follow a change through preparation, control review and assignment, then find the earlier version and its acknowledgements. This shows whether your team can follow the record after the work changes.

Use the SWMS demonstration checklist

How is a SWMS review different from a worker acknowledgement?

The review records the decision about the prepared controls before the approved version is assigned. A worker acknowledgement records a separate step against the version assigned to that person. Keeping the two records distinct helps your team follow what was reviewed and what each person acknowledged.

Follow review, assignment and acknowledgement

See SafeSite with your team

Walk through your own SWMS process.